电话:
关闭
电力运行技工 面议 收藏 申请职位
您当前的位置: 首页 > 职位列表 > 职位详情

电力运行技工

面议
浙江-台州 | 中专学历
2019-03-18 更新 被浏览:
经理
电话: 企业设置登录用户才能查看联系方式 立即登录
职位描述
招聘人数:5 人 性别要求:不限性别 三班倒,3年以上高压电工经验,有相关高压电工证书。
求职提醒:求职过程请勿缴纳费用,谨防诈骗!若信息不实请举报。
该公司的其他职位
  • 1000人以上
吉利V汽车项目
GEELY V Automobile Project

台州· 吉利V汽车项目是台州吉利汽车转型升级的重要项目,是浙江省重大工业/产业项目,项目占地面积73.44万平方米(约1101.6亩),总建筑面积约39.3954万平方米,具有年20万辆乘用车的生产能力,生产符合沃尔沃全球统一技术和质量标准的国际品牌豪华汽车。
Taizhou·Geely V Automobile Project is an important program for transformation an d upgrading of Geely Automobile in Taizhou. It is also one of the key industrial programs in Zhejiang province. Claiming a land area of 734.4 Km2 (equal to around 1101.6 Mu), an d with total construction area of 393.954 Km2, upon completion, it will boast an annual output capacity of 200K vehicles, which will be mostly luxury cars compliant with globally uniform standards of technology an d quality from Volvo, to be marketed internationally.

该项目以成为全球一流汽车企业为目标,以实现全工艺自动化、信息化、智能化为要求,建设绿色环保的现代化工厂,建设包括冲压、焊装、涂装、总装四大工艺,生产节拍30JPH,建设与其配套的国际化零部件物流园区
Aiming at tier one manufacturers of automobiles in the world as its benchmark target, this production site will be a modern plant equipped with automation for all processes, an d advanced information an d IT technologies, an d at the same time it will be green an d eco-friendly. At the site there will be shops covering the four major processes: Stamping, BiW (body in white), Painting, an d TCF (also known as General Assembly elsewhere). The site is going to run at 30JPH, an d there will be international logistic parks to meet its need for components an d parts.

冲压工艺采用国际先进的高速自动化机械式冲压线;焊装工艺选用国际知名机器人焊接线,自动化率100%;涂装工艺采用国际先进的水性漆涂料和世界一流的德国杜尔涂装自动化生产线;总装工艺选用柔性总装线,可满足多车型混线生产,实现全智能化、信息化质量控制。项目遵循5 P 管理远策:人、流程、产品、营销、合作伙伴,实现企业可持续包容发展,同时采用废水处理、中水回用等节能减排新技术,打造低碳环保、低排放、工艺领先的一流现代化绿色工厂。
Its Stamping shop adopts automatic high-speed mechanical press lines of international standards; in BiW shop, at welding lines robots from supplier(s) of world reputation will be seen, driving a 100% automation level; Painting shop boasts advanced paint material which is water-based, plus a world-class automatic painting line from Durr, a German supplier; the production lines in TCF is so designed an d configured that it will be able to accommodate mixed production of multiple models, assisted by full scale implementation of information an d IT technology based Quality Control measures. The program is to be managed following the so called 5P principle, i.e. the emphasis is laid on People, Process, Product, Promotion, an d Partner, so as to achieve a sustainable an d accommodating growth of the organization. Meanwhile, adoption of such new technologies for energy efficiency an d emission cut, as Waste Water Treatment, an d Utilization of Recycled Water, means that the plant is going to be a modern one featured with eco-friendliness, low carbon emission (or that of other harmful substances, for that matter), an d very advanced production technologies.
分享到朋友圈
分享至朋友圈
↑微信扫上方二维码↑
生成职位海报
分享到朋友圈
问公司
对职位有疑问?快来问问吧
手机扫一扫
随时随地找工作
简历投递成功
您可以在 个人中心 - 简历管理 - 我的简历 中查看您创建的简历
您可能感兴趣的职位:
关注微信公众号
申请结果早知道
联系时请说明是在商丘人才网_商丘招聘网_商丘人才市场_豫商人才网招聘平台上看到的
正在获取二维码...
请使用微信扫一扫
微信公众号
手机浏览

Copyright © 2022 All Rights Reserved 版权所有 豫商人才网 豫ICP备19004769号

地址:河南省商丘市睢阳区神火大道176号联合大厦13楼 EMAIL:postmaster@37jobs.com

用微信扫一扫